Properties

Pathway Triangle, Morrisville, NC

Acquired by King Street in September of 2021, The Pathway Triangle development site constitutes 75 acres anticipating 978,000 RSF of life science development across six buildings (both cGMP and R&D lab use – both permitted uses under the site’s existing BAC zoning). The site is situated on the 1.6 mile McCrimmon Parkway extension in Morrisville, which connects the two major thoroughfares of Aviation Parkway and Airport Boulevard. The site is located in the heart of the Raleigh-Durham Research Triangle region, with convenient access to all major amenities and surrounding communities.

King Street continues to advance design and permitting for the northern half of the site (Phase I, which totals approximately 477,000 SF).  Current schedule anticipates construction for Phase I beginning in May 2022. 

477,000 SF, Morrisville, NC